Fuel Unloading Point:
(Taken from my news page)
Finally also finished is a Knightwing fuel unloading point, bodged so that instead of a 10 inch section on each side of a length of straight track, they are now attached together giving a 20 inch length, enough to unload 5 TTA tanks. This required major work on the pipe work, as well as the removal of one unloading bay (which was in tern modified to be used as the cover of a centre main pipe where the fuel pipes lead to. I have now decided that the actual fuel storage tanks are underground.
The extended fuel point placed alongside the shed
the view from the end, warning signs, fire equipment and fuel pipes still need adding